Project Assembly

Project Assembly and Testing

Our assembly team builds your equipment as a system to test prior to shipment to minimize plant down time.

We typically pre-test and pre-wire as much as practical, to save you valuable time in the field.

This results in vertical startups of your line, allowing you to start producing at maximum capacity as soon as possible.

We will even pre-build an entire line in our facility.  Our 47,000 square foot building and full length 7.5 ton bridge crane allow us to do this, resulting in the best possible installation and startup process.

Factory Acceptance Testing

 

Learn what one of our clients says about NCC’s Factory Acceptance Testing process

Final Acceptance Testing